On 4 November 2026 the Union Cabinet approved two schemes for the clean-energy supply chain, both running from 2026-27 to 2030-31:

  • Viability gap funding for grid-scale energy storage, with an outlay of ₹14,500 crore, supporting 92 GWh of capacity: 60 GWh pumped hydro, 30 GWh batteries and 2 GWh other technologies.
  • Capital expenditure support for critical-mineral processing, with an outlay of ₹2,814 crore, for lithium and nickel processing plants. The separate Cabinet approval specifies 30 per cent capital support for four plants.

Foundation connections

Storage is what lets solar and wind power be used after sunset and when the wind drops. Read energy for grid integration of renewables, financing and risk allocation for how viability gap funding works, and distribution of key natural resources for critical minerals.

Exam use and limits

  • Prelims: viability gap funding is a one-time or deferred grant that makes a commercially unviable but socially useful project bankable.
  • Mains: India's dependence on imported processed minerals; storage as the bottleneck in the move to non-fossil power.